Projects Executed
Parent company M/S Shanti Industries and KN Tech Infra Pvt Ltd has executed construction contracts for a number of prestigious private, public sector and Multinational's clients. Some of the projects executed / being executed are as under:
Airforce Naval Housing Board, Shatabdi Nagar, Meerut
Complete internal electrification of 545 Flats at AFNHB, Meerut awarded in name of technology infrastructure and construction and most of the work has been completed and project is nearing completion.
Sun Life Science
Sun life science building work was awarded on the basis of past performance at saint biotech and with a fixed yardstick to complete the work in record time. As per the expectation of client, work was completed ahead to the time schedule maintaining all norms and quality standard.
Kim Lab Biotech
This work awarded in the series of pharmaceutical Industries and this work was also completed ahead to time schedule.
GT Pharmaceuticals
Very prestigious building completed in framed time schedule given by the owner.
X-Ozone Biotech
Work was awarded by M/s X-Ozone Biotech based on the previous appreciation in execution of the similar work and this work is under execution maintaining all Engineering quality standards.
Hariom Udyog
This work was general type but with all RCC and steel fabrication structure involving erection and fabrication of heavy structural steel .This work is also almost on verge of completion.
Stone Pitching Work For Yamuna River Embankment at Agra Chambal Dal Project
Work was completed in very difficult situation in specified time schedule
Construction Of Bridge Over Yamuna Canal in Sikandarpur (Tajewala), Saharanpur-Uttar Pradesh.
This work was awarded on crash basis in pre-monsoon by Uttar Pradesh Irrigation department. Bridge was to be constructed in flowing water during rainy season itself. In spite of all the hurdles this bridge was built in record time.
Laying of Rcc Pipe Line for Sun, Saint and Kim Biotech
Work was completed as per drawings, technical specifications and instructions of the Engineer.
Krishna Palace Shopping Complex at Neelam Flyover - Faridabad
This work was completed in difficult situation due to its vicinity with Neelam Flyover as well as with railway Track. A mass concrete structure work completed in record time.
SRS Industries
SRS awarded work to complete in short schedule with a condition that on completion 2nd phase will be awarded. Due to completion of work ahead to schedule SRS awarded 2nd phase and work was completed in time.
Chambal Dal Project (UP-Irrigation Dept.)
Very Prestigious work for water supply scheme of UP Irrigation Dept. This work was also completed as per the schedule of UP Irrigation.
Saint Biotech
Constructed prestigious unique scientific centrally air- conditioned building on priority basis in record time and earned appreciation from client.
Renovation and construction of ESIC Hospital building
Construction of ESIC hospital building at Bhubaneshwar, orisha
SHRI KRISHNA GROUP HOUSING SOCIETY
In one of the best locations in Faridabad sector 21 which is in close proximity to New Delhi as well as Gurugram. This is an ongoing project which is ready to be handed over in about 6 months.